We christened the bike with the fairing and badges on Thursday evening.
I still have to paint the number plate onto the wind-screen, finish the pipes, air filter, brake lines and make a support to control the shape of the bubble. I also need to make several trips to the hardware store to get everything bolted down right, tight and shiny before the shake down can begin.
No comments:
Post a Comment